We transported for M/s DAELIM all their oversized equipments inside Qatar and then moved them from Qatar to Kuwait and then to UAE on completion of their projects.
For Qatar Steel Company we have done lots
of transportation contracts. Major ones are as
follows :
For M/s. HALLIBURTON LTD, U.S.A. We move all their equipment inside Qatar and other Gulf Countries. We have carried out many civil works for their storage tank etc. We also transport acid for them in huge tankers from UAE.
Recently we have done a lot of transportation work for M/S SPERRY-SUN INT'L for moving their equipments inside Qatar and transportation to and from Qatar, U.A.E. and K.S.A.
For M/s SCHLUMBURGER OVERSEAS we supply heavy cranes and carry out all their transportation of heavy machinery within Qatar, UAE and K.S.A.
For M/s SAIPEM-QATAR we have moved big machines and equipments in heavy low bed trailers to Kingdom of Saudi Arabia and UAE.
For FOCHI-QATAR Branch our company transported heavy cranes and machinery inside Qatar and to the UAE. We have also supplied them big tankers, cranes power generators and air compressors for their projects in Ras Abu Fontas and Umm Said.
Our Company was the main transport contractor for moving all mud chemicals during MILPARK's contract with AMOCO. We are also the sole agents of this company for the State of Qatar.
Since 1981 we have a permanent contract for transport of polyethylene from Qatar to all GCC countries and some other Arab countries.
For LOFFLAND BROTHERS we have
moved rigs in Qatar, Saudi Arabia, UAE and
Oman. Major international rig moves done
so far for them are as follows :
We have moved rig 401 of ENSCO USA from Dubai, UAE to M/s ELF AQUITAINE onshore location in Qatar. The rig consists of 114 heavy and oversized loads and we have moved it in a week's time prior to the completion time of 12 days.
For ADDCAP – Abu Dhabi transport of drilling chemicals from Abu Dhabi to Doha.
For INTERNATIONAL DRILLING Fluids, we transport their chemicals inside Qatar and also from UAE to Qatar.
We have moved their rig 214 from Safah Oil Field (Oman to AMOCO's location in Qatar) in 1991 for their exploration programme. The same rig was moved within Qatar 2 times to different locations. The rig was a desert rambler and had large wide loads of approximately 250 tons a piece. This is the biggest rig we have ever moved.
We have done major work with this firm who is the dredging contractor of Ras Laffan Port. We moved all their dredging materials inside Qatar and from UAE, Bahrain to Doha. Our cranes and trucks played an important role in this major project.
Our Company supplies heavy construction equipments like bulldozers, shovels, excavators, heavy cranes etc. for this prestigious project. Our fuel station has a permanent contract with them for fuel supply.
QTTC is having this prestigious contract from 1993 onwards on which our Company is the contractor till 2002 which we have succeeded for 3 consecutive bids. This is one of the major contracts handled by our concern which involves all their transportation within Qatar (normal, heavy, oversized) and other G.C.C. countries, supply of heavy cranes, low beds, modular trailers and forklifts. Clearance at sea, land and air customs including destuffing of containers.
We are logistic contractors for this prestigious Oil Co. of Japan since the beginning of their exploration and development of the Al – Karkara field in 1998. Job involved transportation of equipments within Qatar and G.C.C., provide open storage and warehouse, supply of all lifting equipments at their base in our own premises and Doha Port with skilled base coordinators, material controllers, transport supervisors and labourers. We are supplying fuel and water for their operations including supply vessel loading and unloading supervision.
We have been awarded this prestigious contract for 3 years from the year 1998 for "Material Handling Services" with this multinational American Oil Co. This job involves supply of all lifting equipments at their bases with skilled workers and permanent long term transport equipments to carry out their daily operations.
We are with this prestigious contract since the year 1995 involving all their equipments within Qatar and G.C.C., which involves heavy and oversized loads, manpower supply, lifting equipment rentals, clearing and forwarding. At certain operations we have engaged upto 50 unit trucks (low beds/flat bed trailers) and manpower upto 50 personnel including experienced supervisors.
Contract With M/s. Samsung Heavy Industries, Korea – NODCO Refinery Expansion Project
We have been awarded this contract to supply all their transportation need related to this project including the transportation of equipments and material from Al-Jubail, Saudi Arabia. All related heavy cranes are included in this project.
We were supplying them all heavy cranes, transportation requirements, manlift and hiab trucks involved in projects with QGPC at Jaleha & Dukhan. At certain stages heavy modular hydraulic platform trailers were provided by us for moving heavy and oversized machineries like separators etc. from Doha Port. Heavy cranes of 120 tons, 125 tons and 300 tons were rented out to them for installation too.
Heavy cranes from 120 tons to 300 tons were provided to them for their major shut down works at NGL, Mesaieed which involved modular hydraulic platform trailers to this company which is Saudi based.
We were the contractors for them in berth construction at Mesaieed for "QAFAC" Mesaieed Project. All their lifting and transportation works with relation to this project were carried out by our concern. Heavy cranes of 150 tons, 125 tons and heavy low beds were engaged for almost 18 months in this prestigious project. Similar works have been carried out in their Ras Laffan Port construction project too.
We were the contractors of this well-known International Dredging Company on their contract with "QAFAC" Mesaieed, Qatar. Work involved transportation of heavy and oversized loads in Qatar and mobilising from UAE too. Heavy crane rentals, fuel and water supply in huge quantity using tankers of capacity from 50 tons to 100 tons were involved in this contract. We have moved more than 50 truck loads in their demobilisation to UAE including loading at Doha and unloading at Abu Dhabi too. Heavy cranes of 400 tons capacity were rented to them for the completion of this project.